Field notes written as the programme happened — what we chose, what broke, what we changed and why. No retrospective tidying up.

Mastering long-range links on milliwatts — encoding, packet structure, antenna placement — then bringing every subsystem up together for the first true integration test.
Read the entry →
From vision to components: defining the mission in December 2024, building the bill of materials, and validating every sensor on the bench before anything was integrated.
Read the entry →The console replays every packet the vehicle sent — altitude, attitude, air quality and the ground track.